Beta Engineers will work with Wakefield Council's Highways and Bridges teams to complete the inspections in six months.
The bridges include a large number of masonry arch bridges and culverts. They also include major bridges over the highway network, the River Calder and the Aire and Calder Navigation Canal.
Read the full case study: Principal Inspection of 50 Highway Structures – Wakefield
